Asbestos Abatement

Asbestos is a gate. Before a pre-1980 building can be renovated, leased, sold or demolished, regulated material has to come out — under containment, with notification filed, and with independent clearance at the end where it is required. We build the containment, remove the material wet, and hand over a complete job file.

Most asbestos calls start the same way: a survey came back positive, or a renovation stopped because someone opened a wall. From there the sequence is fixed — notification, containment, controlled removal, then independent clearance before anyone else works in the space. The cost of getting that sequence wrong is not a fine, it is a stopped job and a contaminated building.

The file matters as much as the containment. Notification, containment logs, manifests and, where clearance is required, the independent clearance letter all land in one job record — which is what an owner, a general contractor or a carrier actually needs when the scope is questioned later.

What the scope covers

  • Full containment removal
  • Pipe insulation and fitting removal
  • Flooring, mastic and sheet vinyl removal
  • Popcorn and acoustic ceiling texture removal
  • Plaster, board and transite removal
  • Waste packaging, labeling, manifest coordination and disposal

Common questions

Asbestos Abatement, answered.

How long does notification take?
It is a fixed waiting period after the filing, and it runs before mobilization. The most common reason an abatement job starts late is that nobody built the notification window into the schedule.
Do you do the clearance yourselves?
No, and no contractor should. Independent third-party clearance is what makes the result defensible. The party clearing the work is never the party that did it.
Can I stay in the building?
It depends on the scope and the containment. For a single-room scope in a larger building, often yes. For whole-house work, no. We will tell you which one you are looking at during the walkthrough.

Tell us what you are dealing with.

Tell us what was found, what work is planned and when the property needs to be ready. We will walk the site, define the scope and provide a written proposal with the work sequence, exclusions, schedule and price.